• español
    • English
  • Login
  • español 
    • español
    • English
  • Tipos de Publicaciones
    • bookbook partconference objectdoctoral thesisjournal articlemagazinemaster thesispatenttechnical documentationtechnical report
Ver ítem 
  •   IMDEA Networks Principal
  • Ver ítem
  •   IMDEA Networks Principal
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Routing and Scheduling for Energy and Delay Minimization in the Powerdown Model

Compartir
Ficheros
head.pdf (217.9Kb)
Identificadores
URI: http://hdl.handle.net/20.500.12761/1187
ISSN: 0028-3045
DOI: 10.1002/net.21474
Metadatos
Mostrar el registro completo del ítem
Autor(es)
Andrews, Matthew; Fernández Anta, Antonio; Zhang, Lisa; Zhao, Wenbo
Fecha
2013-05
Resumen
Energy conservation is drawing increasing attention in data networking. As networks are designed for peak traffic, network elements typically operate at full speed and consume maximum power even when carrying low traffic. One school of thought believes that a dominant amount of power saving comes from turning off network elements. The difficulty is that transitioning between the active and sleeping modes consumes considerable energy and time. This results in an obvious trade-off between saving energy and provisioning performance guarantees such as end-to-end delays. We study the following routing and scheduling problem in a network in which each network element either operates in the full- rate active mode or the zero-rate sleeping mode. For a given network and traffic matrix, routing determines the path that each traffic stream traverses. For frame- based periodic scheduling, a schedule determines the active period per element within each frame and prioritizes packets within each active period. For a line topology, we present a schedule with close-to-minimum delay for a minimum active period per element. For an arbitrary topology, we partition the network into a collection of lines and use the near-optimal schedule along each line. Additional delay is incurred only when a path switches from one line to another. By minimizing the number of switchings via routing, we show a logarithmic approximation for both power consumption and end- to-end delays. If routing is given as input, we present two schedules one of which has active period proportional to the traffic load per network element, and the other has active period proportional to the maximum load over all elements. The end-to-end delay of the latter is much improved compared to the delay for the former. This demonstrates the trade-off between power and delay. Finally, we provide simulation results to validate our algorithmic approaches.
Compartir
Ficheros
head.pdf (217.9Kb)
Identificadores
URI: http://hdl.handle.net/20.500.12761/1187
ISSN: 0028-3045
DOI: 10.1002/net.21474
Metadatos
Mostrar el registro completo del ítem

Listar

Todo IMDEA NetworksPor fecha de publicaciónAutoresTítulosPalabras claveTipos de contenido

Mi cuenta

Acceder

Estadísticas

Ver Estadísticas de uso

Difusión

emailContacto person Directorio wifi Eduroam rss_feed Noticias
Iniciativa IMDEA Sobre IMDEA Networks Organización Memorias anuales Transparencia
Síguenos en:
Comunidad de Madrid

UNIÓN EUROPEA

Fondo Social Europeo

UNIÓN EUROPEA

Fondo Europeo de Desarrollo Regional

UNIÓN EUROPEA

Fondos Estructurales y de Inversión Europeos

© 2021 IMDEA Networks. | Declaración de accesibilidad | Política de Privacidad | Aviso legal | Política de Cookies - Valoramos su privacidad: ¡este sitio no utiliza cookies!